Operation - Glacier bay 65415W-6A01 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para 65415W-6A01:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Making the water supply
connections
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
Use wrenches to tighten the connections. Do not
overtighten.

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator from the faucet (A) with the plastic wrench (N) to
ush the water lines.
Ensure the faucet (A) handles are in the off
position, and turn on the water supply and check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
Remove the aerator and housing (if applicable).
Turn on the hot and cold handles to allow the
water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
Turn off the water and reinstall the aerator and
housing (if applicable).
1
3
8
2
A
N

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

65415w-6a04226026419716

Tabla de contenido