Descargar Imprimir esta página

Bradley SN2008/IR Manual De Instalación página 5

Ocultar thumbs Ver también para SN2008/IR:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Install and Anchor Unit
Rough-in of plumbing lines must be completed before unit
can be properly installed.
A
Remove Access panel and with
the help of another person, place
unit in position.
B
Ensure unit is level, shimming floor unit if
necessary. Using the base as a template,
mark the floor anchor locations.
2
Connect Water Supply to Valve Assembly
A
Connect 1/2" NPT female end of stop/check
valves to supply lines. Connect supply hoses
to hot and cold inlets of the Vernatherm TMV.
Do not turn on water
until Step 3 is completed!
Bradley • 215-1069 Rev. H; ECN 12-00-011
Water Supply Gang
Valve Assembly
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Yellow Tube
(to Aerator)
(to Aerator)
Green Tube
(to Aerator)
(to Aerator)
Vernatherm TMV
Cold Supply Inlet
OPTIONAL TEMPERED LINE CONNECTION: Connect 1/2" NPT
B
female end of stop/check valve to supply line. Connect Tempered
line adapter to Gang Valve Assembly as shown.
15" (381) Dia.
Install a minimum of four 3/8" bolts (supplied
C
by installer) around unit at the marked
locations (eight is recommended). Secure
unit to floor.
Red Tube
Red Tube
Black Tube
Yellow Tube
(to Aerator)
Braided
Hose
Hot Supply Inlet
6/29/12
SN2008/IR
Water Supply Gang
Valve Assembly
OPTIONAL Tempered Line
Adapter Assembly (S39-685)
Stop/Check Valve
5

Publicidad

loading