1. TECHNICAL DATA
Power supply
Absorption
Motor power
Torque
Capacitor
Opening time
Rod lenght (max)
Intermittence
Degree of protection
Temperature
Weight
Electrical board
2. REFERENCE TO ILLUSTRATIONS AND ACCESSORIES
2.1 Standard installation references (fig. 1)
ATTENTION: Only use DITEC's safety devices and accessories for installation.
[1] Radio
[2] Flashing light
[3] Key selector
[4] Connect power supply to an omni-pole switch with a contact opening gap of no less that 3 mm (not supplied
by us)
2.2 Barrier references (fig. 2)
[7]
Container
[8]
Geared Motor
[9]
Key release
[10]
Fixing base
[11]
Flange
[12]
Limit switch group
[13]
Electrical board
2.3
Accessories
-
UP8B
Aluminium round arm 4200 mm
-
UP8M
Red spring Ø7
-
UPC
Set of 10 red reflectors
-
UP8G
Joint for round arm
3. INSTALLATION
Unless otherwise specified, all measurements are expressed in millimetres.
Barrier installation
3.1 Lay a concrete foundation with buried anchoring brackets and the base plate, making sure that it is
perfectly level and smooth. Insert appropriate elements in iron or any other suitable material into the holes
of the anchoring hooks so as to permit fixing to the concrete reinforcement. Route the cable ducts through
the central hole of the plate (fig. 3). Attention: ensure that anchoring is sturdy and stable.
3.2 Fasten the group.
230 V~ / 50 Hz
1.5 A
200 W
160 Nm
8 µF
5-8 s/90°
8400 mm
S2=30 min. / S3=50%
IP45
-15° C / +50° C
90 kg
LogicA21
[5]
Barrier
[6]
Photocells
[14]
Spring
[15]
Transmission lever
[16]
Lever arm
[17]
Top attachment for spring
[18]
Pin for the spring hooking
[19]
Internal mechanical lock
-
UPAF Fixed bearing
-
UPAM Mobile bearing
-
UPGR Aluminium fence L= 2000 mm
9
DITEC S.P.A - IP1513 UP8