(2) Adjust the air pressure to 70 psi (4.9 bar 5 kgf/cm
Connect the air hose.
Do not load any nails in the Nailer.
THE NAILER MUST NOT LEAK AIR.
Hold the Nailer downward and pull the trigger.
THE NAILER MUST NOT OPERATE.
(3) With finger off the trigger, depress the push lever
against the workpiece.
THE NAILER MUST NOT OPERATE.
(4) Without touching the trigger, depress the push lever
against the workpiece.
Pull the trigger.
THE NAILER MUST OPERATE
(5) With the Nailer off the workpiece, pull the trigger.
Depress the push lever against the workpiece.
THE NAILER MUST OPERATE.
(6) If no abnormal operation is observed, you may load
nails in the Nailer.
Drive nails into the workpiece that is the same type to
be used in the actual application.
THE NAILER MUST OPERATE PROPERLY.
2
).
Pull Trigger
Do not pull Trigger
Depress Push Lever
— 11 —
ADJUSTING AIR PRESSURE
WARNING
Do not exceed 120 psi (8.3 bar 8.5 kgf/cm
Adjust the air pressure at recommended operating
pressure 70 – 120 psi (4.9 – 8.3 bar 5 – 8.5 kgf/cm
according to the length of nails and the hardness of
workpiece.
The correct air pressure is the lowest pressure which will
do the job. Using the Nailer at a higher than required air
pressure unnecessarily over stresses the Nailer.
LOADING NAILS
WARNING
When loading nails into Nailer,
1) do not depress trigger;
2) do not depress push lever; and
3) keep Nailer pointed downward.
(1) Pull the nail feeder back until it latches.
(2) Insert nail strips one by one from above the magazine.
Two strips can be loaded at one time.
English
2
).
2
)
Nail Feeder
Nail Strip
Magazine