Technical Data - Neptun NSP 35 Manual De Instrucciones

Bomba para aguas sucias con interruptorde flotador
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 11
Anleitung NSP 35_SPK7:Anleitung SMP 410_1_S
GB
● All fibrous particles which may
have built-up inside the pump
housing should be removed with
a water jet.
● Every 3 months the shaft
ground and as should be
cleaned from mud.
● Remove deposits on the floater
with clear water.
Cleaning the impeller
If excessive deposits collect in the
pump case you must dismantle
the bottom part of the pump as
follows:
1.
Remove the intake cage
from the pump case.
2.
Clean the impeller with clear
water.
Important! Do not put down or
rest the pump onthe impeller!
3.
Assemble in reverse order
Setting the ON/OFF opera-
ting point
The ON and OFF operating point of
the float switch can be set by adju-
sting the float switch in its latching
holder.
Before you put the pump into opera-
tion, please check the following:
● The float switch must be installed
so that the level of the ON opera-
ting point and the level of the
OFF operating point can be rea-
ched easily and with little force.
To check this, place the pump in
a vessel filled with water, raise
the float switch carefully by hand
and then lower it again. As you
do so, note whether the pump
switches on and off.
● Make sure that the distance bet-
ween the float switch head and
the latching holder is not too
small. Proper operation is not
guaranteed if the gap is too
small.
● When you set the float switch,
make sure that it does not touch
the base before the pump swit-
ches off. Caution! Risk of dry-
running.
6
16.05.2007
Guarantee note:
Not covered by guarantee:
● Destruction of rotating mechani-
cal seal by dry running or addi-
tion of foreign bodies in water
● Blockage of running wheel
through foreign bodies
● Transport damage
● Damage caused by unauthorised
persons

Technical data

Power supply
230V ~ 50Hz
Power consumption
350Watt
Delivery rate max..
7.000 l/h
Delivery height max
5 m
Immersion depth max.
5 m
Water temperature max.
35°C
Hose connection
5/4" IG
Foreign bodies up to
dia. 30 mm
Switching point high: ON ca. 50 cm
Switching point high: OFF ca. 5 cm
Performance data
Delivery head
Delivery rate
2m
max.: 4.500 l/h
3m
max.: 3.000 l/h
4m
max.: 1.300 l/h
Disposal and recycling
The unit is supplied in packaging to
prevent its being damaged in tran-
sit. This packaging is raw material
and can therefore be reused or can
be returned to the raw material sys-
tem.
The unit and its accessories are
made of various types of material,
such as metal and plastic. Defective
components must be disposed of as
special waste. Ask your dealer or
your local council.
Ordering replacement
parts
Please quote the following data
when ordering replacement parts:
Type of machine
Article number of the machine
Identification number of the
machine
Replacement part number of the
15:46 Uhr
Seite 6
part required
For our latest prices and information
please go to www.isc-gmbh.info

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

41.705.78

Tabla de contenido