INSTALLATION
Installing/Replacing the lamp
For the installation, you need one of the following lamps:
TC-200:
PHILIPS CDM-T 150W/830 G12
OSRAM HQI-T150/NDL PRO 6000h 230/150W G12
Topspot HIT 230V/150W G-12 6000h nw
GE CMH 150/T G12 6000h
OMNILUX OMD 230V/150W G12 6000h 4200K
TC-300:
OMNILUX OSD 90V/250W GX-9,5 2000h 6700K
OSRAM HSD250 90V/250W GY-9,5 2000h
PHILIPS MSD250 90V/250W GY-9,5 2000h
PHILIPS MSD250/2 90V/250W GY-9,5 2000h
SYLVANIA BA250/2 SE D 90V/250W GY-9,5
The lamp must only be changed when wearing appropriate protective clothing (protection glasses, protection
gloves, helmet with sight, leather apron).
DANGER TO LIFE!
Only install the lamp with the device switched off!
Unplug from mains before!
No. 91014045
No. 91201794
No. 91201797
No. 91201800
No. 91201805
No. 89106005
No. 89106010
No. 89106015
No. 89106115
No. 89106120
CAUTION!
The lamp has to be replaced when it is damaged
or deformed due to the heat!
21/55
(8) Power supply
(9) Fuseholder
(10) Housing screws
(11) DIP-switches
(12) Control LED
(13) DMX-Out socket
(14) DMX-In socket
(15) Lamp system
00026917.DOC, Version 1.4