GE Advantium ZSC1001 Manual Del Usuario página 8

Ocultar thumbs Ver también para Advantium ZSC1001:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Flush Mount Installation Preparation (Monogram Only)
IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or
combined installation.
PREPARE THE OPENING
The Advantium 120 can be installed beside another
Advantium 120 in a side-by-side combination.
Double Advantium 120 Installation:
Cut the opening in a cabinet to the dimensions
shown.
• Center divider acts as cleat for side of each
respective unit. Only one additional side cleat
needed per oven cutout.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
*See table for desired reveals on sides and
between unit.
Dimension 1/8" Reveal
G
53-7/8"
H
1-5/8"
I
26-1/8"
REMOVE THE PACKAGING
• Lift the oven out of the carton.
• Remove all packing material and tape.
36-3/4"
1/4" Reveal
54-1/4"
1-3/4"
26-1/4"
I*
18-7/8"
Construct solid bottom - Min. 3/8"
plywood supported on all four
sides. Must be able to support
weight of oven and contents.
• Open the door and remove parts box.
• Locate parts package containing mounting
screws.
8
23-1/2" min.
G*
H*
I*
1-3/8"

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido