Hinkley 52 WINDWARD Manual De Instrucciones página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
Slip the yoke cover and canopy onto the downrod. (Fig. 3)
Slide the hanger ball onto the downrod, insert the cross pin
2
through the downrod and tighten. Tighten the set screw.
6 feet of lead wire is supplied on the fan for use with
longer downrods.
Lift ball/downrod/fan into hanger bracket opening.
3
NOTE: The tab opposite hanger bracket opening should fit
in slot on ball. (Fig. 4)
Make wire connections, (refer to section titled "Electrical
4
Connections").
Slide canopy up and fasten to hanger bracket with 4 screws
5
provided.
INSTALLATION OF SAFETY SUPPORT:
Attach the lag bolt and flat washer to ceiling joist.
Attach the safety cable to lag bolt. Slide cable
clamp onto safety cable (from fan). Place the
end of cable through the lag bolt. Pull as much
cable through lag bolt as possible. Feed end of
cable into clamp hole and firmly tighten screw
(Fig. 4). Cut off excess safety cable.
NOTE:
Hanger Ball
Hook-up (3) Wires
Downrod
Yoke Cover
Top of
Fan Body
Fig. 3
Hanger bracket
Safety cable
Fig. 4
©2019 Hinkley Lighting, Inc.
Cross Pin
Ground Wire
Set screw
Safety Cable
Canopy
Safety cable clamp
09
| hinkley.com |

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido