Supplies Recommended For Installation; Tools Required For Temperature Adjustment; Install Optional Cabinet - Bradley EFX 25 Manual Del Usuario

Válvula mezcladora termostática con armario opcional
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Supplies recommended for installation

• Lockable shut-off on the outlet if tempered water is supplied to one or more emergency fixtures
• Lockable shut-off on the inlets/supplies
• (6) 3/8" wall anchors and fasteners for surface-mounted cabinet
• (4) 1/4" fasteners (and wall anchors, if necessary) for recess-mounted cabinet
• Unions on all connections to facilitate removal of valve

Tools required for temperature adjustment

• 5/32" Allen wrench
• Blade screwdriver
1
Install Optional Cabinet (If not installing cabinet, skip to Step 2)
Recessed Cabinet:
1. Rough-in wall opening 24-1/2" W x 24-1/2".
2. Insert the cabinet and secure to wall with four 1/4"
fasteners properly anchored (supplied by installer.)
3. Install two anchors and screws through the valve
bracket in back of the cabinet into a secure brace
(supplied by installer) or into wall. This will support the
valve.
4. Install the valve nipples and one-half of the union ball
valve using pipe sealant or teflon tape. Install the other
half of the union ball valve onto inlet and outlet pipe.
5. Insert the valve into the bracket in the cabinet (right
side goes in first). Continue with the valve installation
procedure.
6. Position the wall flange tight to the wall and caulk in
place.
Bradley • 215-1290 Rev. R; ECN 17-09-009
Surface-Mounted Cabinet:
1. Measure and mark the cabinet mounting hole
locations at the dimensions shown on next page.
Install six 3/8" wall anchors (supplied by installer).
2. Position the cabinet onto the wall and secure into
place with six 3/8" wall fasteners (supplied by
installer).
3. Install the valve nipples and one-half of the union
ball valve using pipe sealant or teflon tape. Then
install the other half of the union ball valve onto the
inlet and outlet piping.
4. Insert the valve into the bracket in the cabinet (right
side of the valve goes in first). Continue with the
valve installation procedure.
12/7/2017
EFX 25/S19-2100
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-2100Efx25/p/rsEfx25pEfx25rs

Tabla de contenido