Section 2 Installation; General; Receipt Of Equipment; Unpacking - Brooks Instrument Sho-Rate 1350G Serie Manual De Instalación Y Funcionamiento

Ocultar thumbs Ver también para Sho-Rate 1350G Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49
Installation and Operation Manual
X-VA-1350G-eng
Part Number: 541B205AAG
November, 2016

2-1 General

2-2 Receipt of Equipment

2-3 Unpacking

2-4 Return Shipment

2-5 Recommended Storage Practice

Brooks
This section provides installation instructions for the Brooks
Models 1350G/1355G Flowmeters. Refer to Section 1 of this manual for
connections.
When the equipment is received, the outside of the packing case should
be checked for any damage incurred during shipment. If the packing case
is damaged, the local carrier should be notified at once regarding his
liability. Remove the envelope containing the shipping list. Carefully
remove the equipment from the packing case and inspect for any
damaged or missing parts.
In the event that the meter is damaged during shipment, the Product
Service Department, Brooks Instrument, LLC, Hatfield, PA 19440 should be
contacted to obtain a return shipment form.
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554 FLOW (3569)
Tel (215) 362 3700
Fax (215) 362 3745
E-mail: BrooksAm@BrooksInstrument.com
www.BrooksInstrument.com
Brooks Instrument
Neonstraat 3
6718 WX Ede, Netherlands
P.O. Box 428
6710 BK Ede, Netherlands
Tel +31 (0) 318 549 300
Fax +31 (0) 318 549 309
E-mail: BrooksEu@BrooksInstrument.com
Carefully unpack the meter and inspect it for any damage that may have
occurred during shipment. The flowmeters are shipped completely
assembled and tested. It should not be necessary to tighten or adjust any
of the parts when it is received.
Do not return any assembly or part without a Return Materials Report. The
Return Materials Report is available from all District Sales Offices and the
Product Service Department, Hatfield, PA 19440. Information describing
the problem, corrective action, if any, and the work to be accomplished at
the factory must be included.
If intermediate or long term storage is required for equipment, as supplied
by Brooks Instrument, it is recommended that said equipment be stored in
accordance with the following:
• Within the original shipping container.

Section 2 Installation

®
TM
Sho-Rate
Models 1350G/1355G
Brooks Instrument
1-4-4 Kitasuna Koto-Ku
Tokyo, 136-0073 Japan
Tel +81 (0) 3 5633 7100
Fax +81 (0) 3 5633 7101
Email: BrooksAs@BrooksInstrument.com
®
Sho-Rate
2-1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sho-rate 1355g serie

Tabla de contenido