EN
IMPORTANT
Please read these instructions carefully before you start to assemble this product.
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
» Care & Safety Advice
•
Please follow the instructions as listed in this manual.
•
Sort the parts and check against the contents list.
•
For safety purposes we strongly recommend the product to be assembled by
at least two people.
•
Some parts have metal edges. Please be careful when handling components.
Always wear gloves, shoes and safety goggles during assembly.
•
Do not attempt to assemble the Gazebo in windy or wet conditions.
•
Dispose of all plastic bags safely – keep them away from children's reach.
•
Keep children away from the assembly area.
•
Do not attempt to assemble the Gazebo if you are tired, have taken drugs,
medications or alcohol, or if you are prone to dizzy spells.
•
When using a stepladder or power tools, make sure that you are following the
manufacturer's safety advice.
•
Do not climb or stand on the roof.
•
Heavy articles should not be leaned against the poles.
•
Keep roof and gutters clear of snow, dirt & leaves.
•
Heavy snow load on roof can damage the Gazebo making it unsafe to
stand below or nearby.
•
This product was designed to be used mainly as a Gazebo.
If color was scratched during assembly it can be fixed with the following tint:
Grey – RAL 7012
» Cleaning Instructions
In order to clean the Gazebo, use a mild detergent solution and rinse with
cold clean water.
Do not use acetone, abrasive cleaners, or other special detergents to clean
the panels.
» Tools & Equipment
TOO1(Supplied)
5mm
3/16"
13mm
SILICON \
CAULK
10mm
25/64"
Attention
•
Please note you install the panels with the UV protected side out
(marked with "THIS SIDE OUT") and peel the film strip covering the panels.
•
Screws and plugs are not supplied.
•
Please tighten all screws when completing assembly.
•
Anchoring this product to the ground is essential to its stability and rigidity.
It is required to complete this stage in order for your warranty to be valid.
When encountering the information icon, please refer to the
relevant assembly step for additional comments and assistance.
» During Assembly
During assembly use a soft surface below the parts to avoid scratches and damages.
Step 8: Optional - if you wish to add curtains / mosquito netting -
Please thread the plastic clips through the rail in each profile.
(Curtains / mosquito netting are not supplied).
Add clips according to the specific quantity of curtain rings.
Step 10: It is recommended to use a carton or other soft material under the lowered
corner in order to avoid scratches and peeling of paint.
Steps 10a+12a: Please note that screws insertion should be done from the outside.
Steps 11+13: Please note that screws insertion should be done from the bottom up.
Afterwards please use the tool T001.
Step 14: Please add silicone on the inner area of part #8030 as illustrated.
Step 19: Please drill holes in the panels, parallel to the holes in profiles #7663.
Step 21d: Press the drainage pipe into part #8098 until it clicks and locks inside.
Step 22: Please level the profiles' legs and adapt screws and plugs to your specific
ground type.