NOTE - The automatic procedure may be run even if the A/C system is empty. In this case the
machine will begin with the vacuum phase. When working with A/C systems with a single
high-pressure coupling, set the charging quantity between 3 and 4 oz. (100g) in excess of the
required quantity, since in this case it will be impossible to recover the residual refrigerant from
the hoses.
ROUTINE MAINTENANCE
FILLING THE MACHINE BOTTLE
This operation must be performed whenever the available refrigerant fluid in the bottle is less
than 4.5lb (2kg) and must in any case be performed when the "empty bottle" alarm is
displayed. Procure a bottle of R134a gas and connect the liquid side coupling of the external
bottle to the high pressure hose (if the external bottle is not supplied with a liquid side coupling,
upend it to recover liquid refrigerant). Open the tap of the external bottle and the high-pressure
tap of the machine. If the external bottle is not supplied with a suction device, turn it upside
down to obtain a higher delivery rate.
Switch the machine on. The MAIN MENU will appear after a few seconds:
Select NEXT MENU:
Select BOTTLE FILLING:
Set the quantity of refrigerant to be transferred to the machine bottle (the quantity must be
between the limit values suggested by the machine) and press START to confirm:*
Press START:
Press START:
INSTRUCTIONS MANUAL
AUTOMATIC PROCEDURE
ASSISTED PROCEDURE
<NEXT MENU>
Gas avail
X:XX lb
CALIBRATION
DATA AND CONFIGURAT.
SERVICE ALARM
<BOTTLE FILLING>
BOTTLE FILLING
Set amount:
xx lb
Min: x
max: xx lb
press START
Use the HP hose to
connect external
bottle and
press START.
Open external
bottle tap, open
HP tap, and
press START.
-17-