WAWAK Hot-Steam SGB Serie Manual De Instrucciones página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATING MANUAL
Hö t-Steam
SGB
®
Thank you for purchasing the Hö t-Steam
Hö t-Steam
SGB
®
require a boiler to operate. Please read the manual thoroughly before using the
iron to ensure its longest possible life
Table of Contents
A. Installation & Connecting
B. Operation & Use
C. Troubleshooting
D. Maintenance
E. Warranty Coverage
WARNING
Be sure to have 110V (10Amps) capacity power supply source to prevent
shut offs in circuit breakers before attempting to plug in the iron.This iron
is recommended for commercial use only.
A. INSTALLATION & CONNECTING
1. Before setting up your Water Tank, find a secure place where the tank can
be stationed at least 3ft high from the iron.
2. Locate the end of the Silicone Hose attached to the Red Mesh Filter and
connect into the Water Tank fitting.
3. Close the Water Tank Valve and fill in with water.
4. Open and pour the entire Resin bag into the tank and keep it covered.
5. Hang the Water Tank.
6. Place the iron on the Iron Rest and adjust the hose length according to
drawing (cut the hose if necessary).
7. Slide down the Hose Spring and cover the iron Hose Fitting once you have
found the proper length.
8. Install the Plastic Clips to hold the hose and the power cord together
Series-Model No. SGB600, SGB700, SGB800 & SGB900
Series Gravity Feed Iron is a steam electric iron and does not
SGB
Series Gravity Feed Iron. The
®
.
.
(optional)
1

Publicidad

Tabla de contenido
loading

Tabla de contenido