Important Notice - Water Solutions Zoeller Shark 800 Instrucciones De Instalación

Bombas trituradoras
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE HANDLING. Single phase pumps
are supplied with a 3-prong grounded plug to help protect you against the possibility of electrical shock. DO NOT UNDER ANY CIRCUMSTANCES
REMOVE THE GROUND PIN. The 3-prong plug must be inserted into a mating 3-prong grounded receptacle. If the installation does not have such
a receptacle, it must be changed to the proper type, wired and grounded in accordance with the National Electrical Code and all applicable local codes
and ordinances.
"Risk of electrical shock" Do not remove power supply cord and strain relief or connect conduit directly to the pump.
Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician.
Units supplied without a plug (single and three phase) and single phase nonautomatic units with a 20 amp plug must have a motor control
and liquid level control provided at time of installation. The control device should have suitable voltage, ampere, frequency, grounding and horsepower
rating for the pump to which it is connected.
L2 - WHITE
GREEN
L1 - BLACK
1. All power circuits must be disconnected and locked out before any
attempts are made at servicing. The cutter rotor and disc can be removed
and sharpened by grinding the cutting faces. Both rotor and disc must be
removed from the pump. Removal of these parts can be accomplished in the
field by removing pump from the sump and positioning horizontally to access
the intake of the pump. If seals or other repairs are required, the pump must
be totally removed and serviced in a shop by a qualified pump technician or
authorized service center.
2. Thoroughly clean the cutter rotor and disc assembly. Tilt pump back to the
vertical position to make certain the end play has been removed. Check and
record the clearance between the rotor and disc with a feeler gage. The
correct running clearance is between "not touching" and 0.006" (0.152 mm).
3. With pump in horizontal position, heat the hex head bolt in the center of the
rotor with a propane torch. The bolt must be heated to 350° F (177° C) to
soften the thread lock sealer on the bolt for ease of removal. Remove the
bolt by turning in a counterclockwise rotation. It will be necessary to use a
wood block to prevent the rotor from turning while removing the bolt. Pull
rotor from the shaft and remove the spacer shims located behind the rotor.
4. Remove the screws holding the disc and remove disc from the pump.
5. The disc and the rotor cutter can be replaced with new service parts or
resurfaced by grinding. Resurfacing is accomplished by surface grinding
both disc and rotor to a 32 micro finish. Do not attempt grinding in the
IMPORTANT NOTICE: Some insurance policies, both commercial and residential, extend coverage for damages incurred by product failure. You will need to
have possession of the product to support your claim in most cases. Zoeller Pump Co. will exchange the unit or refund the original purchase price once the claim
is settled with the insurer in the case where you need to retain possession of the product to support a damage claim you submit to your insurance company.
SINGLE PHASE WIRING INSTRUCTIONS
NONAUTOMATIC
WIRING DIAGRAM
WHITE
START CAPACITOR
BLACK
WHITE
BLACK
2
1
5
RELAY
RUN CAPACITOR
(1) BLUE
(2) RED
(3) YELLOW
(1) BLUE
(2) RED
(3) YELLOW
MOTOR
OVERLOAD
START
RUN
153224
© Copyright 2015 Zoeller
AUTOMATIC
WIRING DIAGRAM
2
COM
4
FLOAT
SWITCH
1
NC
3
L2 - WHITE
GREEN
L1 - BLACK
2
1
5
RELAY
(1) BLUE
(2) RED
(1) BLUE
(2) RED
MOTOR
REPAIRS
field. Send parts to a qualified machine shop or return to the factory for
repair. The disc, rotor and shims are a matched set. Keep parts together.
Measure disc before and after resurfacing with micrometer and record
measurements.
6. After resurfacing, the disc and rotor must be flat within 0.001" (0.025 mm).
If the disc has been surface ground, it will be necessary to remove shims
to compensate for the material removed from the disc plus any amount
over 0.006" (0.152 mm) measured in the field (step 2, above) before the
rotor and disc were disassembled from the pump. The shim thicknesses
and disc should be measured with a micrometer and the amount removed
from the disc plus any clearance over 0.006" (0.152 mm) must match the
shim thickness being removed.
7. Clean bottom of pump where disc is located and replace disc and retainer
screws. Replace rotor with the correct shims. Install washer and torque to
30 in.-lbs. apply Loctite 262 thread-lock sealant or equal to bolt threads
prior to insertion. Check running clearance with pump in vertical position to
remove end play. Clearance must be between "not touching" and 0.006" to
obtain efficient grinding when the pump is put back in service.
8. Check the oil in the motor housing on 800/803/805/807 pumps before
reinstalling. The level should be even with the fill plug when pump is in
the upright position. Add oil if required. Use insulating oil supplied by the
factory.
Co. All rights reserved.
®
4
WHITE
BLACK
START CAPACITOR
BLACK
WHITE
BLACK
RUN CAPACITOR
(3) YELLOW
(3) YELLOW
OVERLOAD
START
RUN
153223

Publicidad

Tabla de contenido
loading

Productos relacionados para Water Solutions Zoeller Shark 800

Este manual también es adecuado para:

Zoeller shark 803Zoeller shark 805Zoeller shark 807

Tabla de contenido