Ashland Pump EP40M1-20 Manual De Operación, Desempeno, Especifícaciones Y Piezas De Repuesto página 8

4/10 y 1/2 hp bombas de efluentes
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing Pump in BASIN
Install pump in properly vented basin according to
local codes and regulations. PVC pipe along with plastic
check valve and shut-off valve are recommended. Drill a
1/8" hole in the discharge pipe below the check valve. In-
stall check valve 12" above pump discharge. See Figure
3
Starting Pump After Installing in Basin
Before lowering pump into basin, connect power lines and
start motor. Impeller should turn counterclockwise when
looking at impeller.
Service and Repair
Important: Pump should be thoroughly cleaned of trash
and deposits before starting disassembly operations
(pages 6-8).
WARNING
Disconnect all power and control wires to motor at
control panel before starting disassembly operation. Never
rely on opening circuit breaker only.
CAUTION
Operating pump builds up heat and pressure; allow time
for pump to cool to room temperature
Effluent Pumps
Model: EP40 & EP45 Series
Installation and Service
Entry pipe
Air bleed hole
8
To control
panel
Union
Vent
Shut-off valve
Check valve
Discharge pipe
FIGURE 3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ep40m2-20Ep45m1-20Ep45m2-20

Tabla de contenido