Descargar Imprimir esta página

Uline H-1256 Manual Del Usuario página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Align foot pedal with side
screws and attach to base.
(See Figure 5)
1. Connect power cord to outlet.
2. Fit poly tubing/bag roll on
the roll bracket and feed
film under the roll alignment
bar. (See Figure 7)
3. Turn on the power switch
and set timer knob to
lowest setting that produces
a good seal for bag
thickness. Thicker bags
need a higher setting.
PAGE 2 OF 6
ASSEMBLY CONTINUED
Figure 5
OPERATION
Figure 7
1-800-295-5510
uline.com
5. Remove black rubber
stopper inside sealing head
base bracket. (See Figure 6)
4. Pull tubing/bag between the sealing jaws and press
down on the foot pedal to begin sealing.
5. When sealing light goes out, hold foot pedal down
for 2-4 seconds, slide cutting blade across cutting
blade bracket to cut bag, then release.
6. Once foot is lifted, sealing jaws are released and
bag can be removed.
Rubber Stopper
Figure 6
1120 IH-1256

Publicidad

loading

Este manual también es adecuado para:

H-1257