PREPARATION
Before beginning assembly, installation or operation of the product, make sure all parts are present. Compare parts with the
package contents list and diagram. If any part is missing or damaged, do not attempt to assemble, install or operate the product.
Contact customer service for replacement parts.
Estimated Assembly Time: 30-40 minutes
Tools Required for Assembly:
• Adjustable wrench or one 1/2 in. box end or socket wrench
ASSEMBLY INSTRUCTIONS
INSTALL THE MOUNTING POST CLAMPS (fIGS. 1 AND 2)
1. Insert two U-bolts [P] around the Snow Thrower frame and through
the mounting post clamp spacer [M1, M2] and the mounting post
clamp [L1, L2] as shown. (Fig. 1)
Note: Exact positioning may vary depending on manufacture.
2. Install two Nylock nuts [O] to each U-bolt. Snug but do not fully
tighten. Leave the nuts loose for final adjustments of the mounting
posts. (Fig. 2)
Note: In some instances, it may be necessary to mount the top
U-bolts above the handlebar crossbar support. (Fig. 2b)
This will help the assembled cab sit higher for added clearance.
Repeat on other side.
CAUTION: Position of the clamps may vary depending on
Snow Thrower Manufacturer
CAUTION: Make sure nothing
interferes with the safe
operation of your snow thrower
M
fig. 2
5
front side of snow
thrower handlebar
upright
L
fig. 1
Top U-bolt
may need to
be on top of
handlebar
crossbar.
fig. 2b