Descargar Imprimir esta página
Uline S-12768 Instrucciones
Uline S-12768 Instrucciones

Uline S-12768 Instrucciones

Garrafón de 5 galones

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

S-12768
5 GALLON CARBOY
TOOL NEEDED
Drill
1.
Drill hole into 63 mm screw cap. (See Figure 1)
2. Screw faucet into 63 mm screw cap. (See Figure 2)
3. Turn handle outward to open. (See Figure 3)
4. Turn handle to the left or right to close. (See Figure 4)
Figure 1
Figure 4
PAGE 1 OF 3
1-800-295-5510
uline.com
INSTRUCTIONS
5. Unscrew cap covering vent hole. (See Figure 5)
6. Drill hole into vent hole area. (See Figure 6)
7.
Figure 2
Figure 5
Pour le français, consulter la page 3.
Replace cap.
NOTE: If leaking, ensure cap is fully tightened.
Gasket is dense and must be tightened past
initial stopping point.
Figure 3
Figure 6
Para Español, vea página 2.
1020 IS-12768

Publicidad

loading

Resumen de contenidos para Uline S-12768

  • Página 1 Para Español, vea página 2. Pour le français, consulter la page 3. S-12768 1-800-295-5510 uline.com 5 GALLON CARBOY TOOL NEEDED Drill INSTRUCTIONS Drill hole into 63 mm screw cap. (See Figure 1) 5. Unscrew cap covering vent hole. (See Figure 5) 2.
  • Página 2 S-12768 800-295-5510 uline.mx GARRAFÓN DE 5 GALONES HERRAMIENTA NECESARIA Taladro INSTRUCCIONES 1. Taladre un orificio en el tapón de rosca de 63 mm. 5. Desenrosque la tapa que cubre el orificio de (Vea Diagrama 1) ventilación. (Vea Diagrama 5) 2. Acople la llave en el tapón de rosca de 63 mm.
  • Página 3 S-12768 1-800-295-5510 uline.ca BONBONNES – 5 GALLONS OUTILS REQUIS Perceuse INSTRUCTIONS Percez un trou dans le bouchon à vis de 63 mm. 5. Dévissez le bouchon du trou d'aération. (Voir Figure 1) (Voir Figure 5) 2. Vissez le robinet dans le bouchon à vis de 63 mm.