Descargar Imprimir esta página

Containex CLASSIC Serie Montaje Y Desmontaje página 11

Paneles de lana mineral

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
20
Adjust the length of the skirting and fasten with 4
screws per panel.
Assembly sequence: Front side first, then long side.
Insert the U-cover profile above the helical line. Install
additional screws before and after the panel joint.
22
Screw the door threshold to the floor and secure the
seal to it.
Completion: Replace the plastic cylinder with the
supplied steel cylinder. Install the doors and windows.
Remove the silicone at the connection points in the
corner posts.
Subject to technical alterations!
21
Secure the corner cover strips in the order shown on
the panels. First on the long sides, then on the front
sides. The corner cover strips must be installed using
contact pressure.
23
Mount the weather strip (rain drip) above the door.
Beforehand, the slip-on groove of the weather strip
must be filled with silicone.
24
Your cabin is now ready.
10
MAMW / 2020

Publicidad

loading