Descargar Imprimir esta página

Containex CLASSIC Serie Montaje Y Desmontaje página 9

Paneles de lana mineral

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
Assembly / disassembly of
wall elements mineral wool
1.1 1.2 1.3 1.4
The door, window, sanitary window and/or full panels
can be arranged according to your needs. (according
to floor plan)
3
Insert the first panel on the front side of the distribution
box. Remove the protective film before assembly.
5
Push against the corner post using spacer screws.
7
Insert the second panel and push to the first.
Secure the latches of the door frame with the L-angle
of the floor frame.
10
Fit the second front end in the same way. Fill the
hollow spaces in the area of the corner posts with
mineral wool.
2
Provide the panel sides, which adjoin the corner posts,
with spacer screws. ATTENTION: Do not damage the
empty ducts in the panel.
4
Insert the first panel in the floor frame (tongue and
groove connection).
6
Fix to the roof with mounting brackets. Preliminary
check of the cable position in the roof frame.
8
When installing door panels, a spacer bar
(length = installation width – 30mm) must be inserted
in the door frame.
9
Adjust both panels to the middle using the spacer
screws.
For easier assembly of the panels on the long sides,
the roof profile can be raised upwards to 15mm.
EN
8
MAMW / 2020

Publicidad

loading