Mounting
Mounting on concrete wall or ceiling
The awnings must be installed at least at the height of 2.5m on a reinforced concrete
wall or ceiling. Please ask professionals for help if you are not sure.
Make sure the wall/ceiling is plane, so that bracket seats solidly.
WARNING! Two healthy adults are needed to move and install the awning.
For safe and smooth installation think about how you will be securing the
awning to the wall ahead of time.
Step 1: Chose the installation area
Ensure that you also take this drop height into account in your decision on where to install
the awning. The drop angle can still be changed after assembly. The ideal drop angle,
however, has already been set at the factory and may only be changed minimally.
The approximate total drop area of the awning varies depending on the type. We recommend
that the awning front bar has a height of at least 2.5 m when it is fully extended.
In the event you would like to mount it above a balcony door, you should leave a space of at
least 20 cm above the door frame if there is enough space available above the door frame.
Drawing 1:
Ensure that you also take this drop height into account in your decision on where to install
the awning. The awning front bar should have a height between 2.5 and 4 m.
Step 2: Mark drilling holes
After choosing mounting position you can mark where you need to drill holes for the brackets.
Draw a horizontal line at the height of the required place. Use a long taper measure, a level
and chalk.
We already marked where and with what width brackets need to be mounted. Measure the
width between the brackets and copy it to the line on your wall/ceiling.
Mark the corresponding places on the wall by running a marker pen through the holes at the
bottom of the brackets.
TOTAL
DROP
Tilt angle
FRONT
BAR
HEIGHT
(≥2.5m)
FLOOR
TOP OF
WALL
BRACKET
HEIGHT