BINDING INSTALLATION INSTRUCTIONS
Transport the pool handle in its transport
box only and avoid improper loads.
Kaldewei shall not assume any liability for
damage incurred due to improper inter-
mediate storage and for damage in trans-
port resulting from the non-compliance
with the above instructions.
The pool handle is partly preassembled.
The contents of the packing are subjected
to extensive quality and performance
checks. Check the contents of the pack-
ing for completeness and possible trans-
port damage.
Observe the respective manu-facturer's
instructions when mounting bathtub an-
chors or carriers.
The installation must be carried out by an
authorized sanitary shop.
All work has to be performed using spe-
cial technical tools.
When installing the pool handle, protect
the tub surface and casing as well as the
wall and floor tiles from damage.
MAINTENANCE OF THE POOL HANDLE
The fastening screws of the pool handle
(see page 23) have to be checked at
regular intervals and retightened, if neces-
sary.
4
Before drilling holes in the floor, make
sure that there is no underfloor heating or
any other line which can be damaged in
this area.
In case the floor or bathtub are tiled, the
support has to be removed until the fine
installation. The fixing devices of the sup-
port have to be protected from soiling and
damage until the fine installation.
When boring tiles, there is a risk of frac-
ture. Mark the bore with a centre punch
or protect the bore position by means of
adhesive tape.
When fastening the floor support in the
joint of a tile or in a wooden floor, the
support has to be fixed with silicone.
Leave the silicone for 24 hours to harden
completely (see manufacturer's instruc-
tions).
Avoid soiling of any kind. In particular,
avoid soiling which might cause clogging
of the drain.
Upon completion of the installation, these
installation instructions have to be hand-
ed over either to the owner or to the su-
pervisor or architect acting as his agent.
D
GB
F
I
E