Continuity Test - PCWork PCW03A Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 279

Continuity Test

1.
Press the
button to turn on the device. Insert the red probe
into the
"COM" input socket. Let the probe's tips touch one another, to
check whether they are correctly connected. The indicator light
should turn green and the buzzer sound.
2.
Press the "AUTO/FUNC" button and choose the
3.
Connect the probes' tips to the measuring object.
4.
The buzzer will signal if continuity is present (resistance is less
than 50 W.) and the LED-indicator of the device will turn green.
In addition the resistance will be shown on the screen. If the
screen shows "OL", the measurement range has been
exceeded or the measuring circuit is defective.
input socket and the black probe into the
20
function.

Publicidad

Tabla de contenido
loading

Tabla de contenido