Descargar Imprimir esta página

EIBENSTOCK DB 200 GR Instrucciones De Servicio página 24

Publicidad

Idiomas disponibles

Idiomas disponibles

Fastening by means of quick action bracing unit
In order to brace the drill rig by means of the quick action bracing unit,
the distance to the opposite wall must be between 1.7 m and 3 m.
Fixing on the floor by means of vacuum
Do not use the vacuum fastening on the wall or overhead!
Vacuum fixing may only be used if the area to be drilled is level, free of
pinholes and cracks, otherwise this method cannot be applied.
For the vacuum fixing you need the vacuum pump, plate and the vacuum
tube (see picture). These are available on request.
Connect the drill rig and the vacuum pump by means of the vacuum tube.
Bring the drill rig into the correct position and switch the pump on.
Check whether the four levelling screws in the base plate are completely
turned back and a vacuum of -0.8 bar minimum is achieved.
The vacuum pump has to run during the complete operation, it is to be placed
in such a position that you can monitor the pressure gauge at all times.
§
§
§
§
Position the drill rig. Place the quick action bracing unit
as close as possible behind the column on the base of
the rig. Fix the drill rig by turning the crank (G) clockwise.
Secure the position by means of the appropriate bolt (H).
Install the drill rig.
Fix the washer (E) and finally the
fastening nut (F) on the quick action
clamping screw (D).
Tighten the fastening nut (F) with a
wrench SW 27.
Before and after tightening the nut (F),
the 4 adjustable screws have to be
adjusted in order to adapt the rig to the
surface.
Do check whether the drill rig is
installed safely and firmly.
24

Publicidad

loading

Productos relacionados para EIBENSTOCK DB 200 GR