Installation And Connection; Installation Site Requirements - Bühler technologies GAS 222.17 Guía Rápida

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
GAS 222.17

4 Installation and connection

4.1 Installation site requirements

Sample gas probes are intended for flange mounting.
• Installation site and installation position are determined
based on requirements specific to the application.
• If necessary, the connection piece should be slightly tilted
toward the centre of the channel.
• The installation site should be protected from the
weather.
• In addition, adequate and safe access for installation and
future maintenance work should be provided. Particularly
follow the uninstalled size of the probe tube!
If the probe is transported to the installation site in pieces, it
will first need to be assembled.
4.2 Installing the Sampling Tube
The sampling tube, if necessary with the fitting extension,
must be screwed in. The probe is then attached to the mating
flange using the included seal and nuts.
4.3 Installing the downstream filter
NOTICE
The downstream filter and the O-ring for the handle must be
inserted prior to first startup.
Operating without downstream filter prohibited!
O-ring handle
4.4 Insulation
On heated probes completely insulate any exposed flange
areas and, if applicable, the connection piece to absolutely
prevent thermal bridges. The insulating material must meet
the application requirements and be weatherproof.
6
Bühler Technologies GmbH
Attach an O-ring suitable
for the expected ambient
temperature to the
handle.
Attach the downstream
filter to the handle. Then
carefully insert the
handle with filter in the
gas probe and turn 90° to
secure.
Verify the handle is
seated correctly. When
seated correctly it locks
onto the filter housing.
4.5 Connecting the Gas Line
The sample gas line must be carefully and properly connected
using a suitable fitting.
This table provides an overview of the sample gas probe con-
nections:
Probe
GAS 222
Connecting
DN65/PN6/
1)
2)
flange
DN3"-150
Sample gas
G3/4
inlet
Sample gas
NPT 1/4
outlet
Blowback
G3/8
connection
Test gas
Tube Ø6
1)
connection
mm
2)
Tube Ø1/4
Filling port
Condensate
Bypass
Control air
Tab. 1: Gas Probe Connections (Varies by Model)
1)
Varies by version.
2)
Only GAS 222.xx ANSI and GAS 222.xx AMEX
WARNING
Gas emanation
Sample gas can be harmful to the health!
Check the lines for leaks.
4.5.1 Connecting the Gas Line
Please note the following items when connecting the sample
gas line (NPT 1/4") on heated probes to prevent thermal
bridges:
• Choose the shortest possible screw connection.
• Shorten the connection pipe for the sample gas line as
much as possible. To do so, remove the insulation around
the sample gas line. This is done by loosening the fixing
bolts.
CAUTION
Fragile
The insulation is fragile. Handle with care, do not drop.
After connecting the sample gas line it must be braced and se-
cured with the clamp.
Long sample gas lines may require additional support clamps
along the way to the analysis system! Once all lines have been
connected and checked for leaks, carefully reinstall and secure
the insulation.
Reservoir
Ball valve
Control
PAV01
pneumatic
valve
drive
3/2-way
solenoid
valve
NPT 1/4
G1/2
NPT 1/4
G1/8
NPT 1/4
BX460039 ◦ 10/2019
G1/4