Allen + Roth LWSI48VG Manual De Instrucciones página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
Step 1:
Remove stone top and the packaging material under the
stone top.
Step 2:
a. Apply a thin bead of silicone compound (not included) to
the top of the vanity base (B).
b. Align the back of the vanity base (B) and put the stone
top (A) on the vanity base (B).
Step 3:
Mark wall for vanity placement and note the location of the
water supply lines and drain on the back panel of vanity.
v
1
v
2
A
B
v
3
3
ASSEMBLY INSTRUCTIONS
Step 4:
Move vanity (B) into proper place against the wall.
Step 5:
Install faucet, drain and supply lines (none included) to
vanity top (A) according to the instructions supplied with
those items.
Silicone
Step 6:
In case of uneven floors, floor levelers are provided at the
bottom of the vanity. If necessary, adjust floor levelers by
hand to correct tilting and/or level doors.
v
4
B
v
5
v
6
4
A

Publicidad

Tabla de contenido
loading

Tabla de contenido