Operating Test - DAITEM 221-21X Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57

8. Operating test

8.1 Before testing the universal transmitter
1. Connect the lithium battery pack
2. Clip the detector casing on to its base.
8.2 Testing the power supply
Press the test button once to check that the
battery is working properly. The LED
indicator lamp should light up red.
8.3 Testing the radio links
• Note that when you press & hold the test
button (for approx. 3 sec.) a "test"
message is issued for loop n° 1.
• Note that when you press the test button
once and then press & hold it (for approx. 3
sec.) a "test" message is issued for loop n°
2.
(For more details, see the chapter on
Checking radio links described in the manual
supplied with the alarm control panel).
• Testing loop n° 1
"beep, detector X, group Y, immediate
(or delayed or combined)"
or
Press & hold the key
(approximately 3 sec.) until
the control panel responds
"beep, remote control X"
IMPORTANT
• For a technical detector:
"beep, technical detector X"
• Testing loop n° 2
"beep, detector X, group Y, immediate
(or delayed or combined)"
then
or
Press & hold the key
(approximately 3 sec.) until
the control panel responds
Press
once
"beep, remote control X"
• For a fire detector:
"beep, fire detector X"
107

Publicidad

Tabla de contenido
loading

Productos relacionados para DAITEM 221-21X

Tabla de contenido