2. Connect input wires from SHP to corresponding breakers of the main electrical panel and output
wires to the load port of the main electrical panel.
11/4in Conduit
Main
Two Ne w Beakers added
fo r Delt a Pr o Charging
Main
Two Ne w Beaker s adde d
fo r Delta Pro Chargin g
18