Quick Introduction - TECE TECEprofil WC-Modul Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67

2. Quick introduction

Notes – see Page 22
Observe proper use and the safety information for the TECE hygiene flush.
Flushing – see Page 23
Ensure that the pipelines are flushed via the shut-off valves before initial opera-
tion of the hygiene flush. Once the pipelines have been flushed, the flush hoses
must be disconnected and removed.
Initial operation – see Page 24
In order to put the hygiene flush into operation, the plug for the hygiene flush
unit is connected to the transformer plug. When powered, a start sequence will
run.
Caution: Since the hygiene flush works on the factory settings follo-
wing initial operation, the power should only be connected once the
ceramics have been installed!
Operation – see Page 24
The TECE hygiene flush can either be operated via the TECE Smartflow app
or the connection to the building control technology (BCT). You can find the
password required for operation via the app on the rating plate.
If multiple new hygiene flushes are installed in a building these should be put
into operation one after another. This allows clear allocation prior to renaming.
Handover – see Page 27
If the hygiene flush is commissioned and programmed by the tradesman or if the
commissioner and subsequent operator are not the same person, the hygiene
flush should be handed over and information provided on the hygiene flush.
EN
21

Publicidad

Tabla de contenido
loading

Productos relacionados para TECE TECEprofil WC-Modul

Tabla de contenido