Maintenance; Battery Replacement - LEGRAND KEOR TOWER SPE Manual De Instalacion Y Uso

Ocultar thumbs Ver también para KEOR TOWER SPE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6. Maintenance

CAUTION
All operations listed in this chapter must be carried out only by a SKILLED TECHNICIAN.
This definition refers to people who have specific technical qualification and are aware of the methods
of installing, assembling, repairing, and using the equipment safely.
The skilled technician is qualified according to national safety standards to work under dangerous
electrical voltage and uses the personal protective equipment required by national safety standards.
6.1

Battery Replacement

DANGER
A battery can present a risk of electrical shock and high short circuit current.
Before the replacement, it is mandatory the reading of chapter 2.
Batteries may only be replaced with the same number and type. Batteries must be brand new.
If the battery brand is different from the one originally installed by Legrand, the estimated battery
autonomy indicated on the display of the UPS may not be reliable.
KEOR SPE 750-1000
1
KEOR SPE 1500-2000-3000
1
2
4
2
4
KEOR TOWER SPE
Installation and User Manual
3
3
5
5
55

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido