Gaggenau AH 320-701 Instrucciones De Utilización Y De Montaje página 15

Campana mural
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Ceiling frame
Ø 8 mm
Drilling template
Fig
Fig
Fig. . . . . 15
Fig
Fig
15
15
15
15
700 mm
Fig
Fig
Fig. . . . . 16
16
16
Fig
Fig
16
16
Before marking the securing holes,
make sure there are no electrical
wires, water pipes or similar behind
the wall surface.
W W W W W ARNING:
ARNING:
ARNING:
ARNING: Turn OFF power circuit
ARNING:
at the service panel before
installing or wiring this unit.
The conduit connector (1/2") must
be placed behind the duct cover on
the wall (Fig. 15).
Fit the wall extractor as follows:
1. 1. 1. 1. 1. Secure the drilling template in
the required position. The
distance between the worktop
and the bottom edge of the
wall extractor is also the line
where the drilling template
must be positioned (horizontal
line at a height of at least 700
mm (27
1
/
") (Fig. 15 and 16).
2
Use a spirit level to check the
position of the drilling template.
2. 2. 2. 2. 2. If possible using a pencil, pierce
the points on the drilling
template. Then mark these four
points on the wall (Fig. 15).
3. 3. 3. 3. 3. After checking the drill holes,
the marked points intended for
mounting the extractor can be
drilled. Use a drill with a
diameter of 8 mm (
4. 4. 4. 4. 4. Insert dowels in the holes you
have drilled.
5
/
").
16
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ah 320-731

Tabla de contenido