Assembly - Powerfix Profi Z31780 Instrucciones De Montaje, De Uso Y De Seguridad

Soporte de amoladora angular de mano
Ocultar thumbs Ver también para Z31780:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30

assembly

cautIOn! danGER Of fIRE! Assemble
and use the product on a fire-resistant surface only.
the following tools are required for
assembly:
7 x Open spanners (1 x 8 mm, 2 x 10 mm,
2 x 14 mm, and possibly 2 x 17 mm)
2 x Allen key
1 x Slotted head screwdriver (approx. 5 mm)
follow these steps:
Fasten the saddle
33
with the hexagonal socket head screws
and washers
(see Fig. A).
34
Fasten the handle
the projecting screw thread and the corresponding
nut (see Fig. A).
note: Please bear in mind that the angle
grinder must be fitted with a suitable cutting
disc before assembly. It is not possible to
change the disc with the angle grinder installed
in the stand.
Now mount the angle grinder in the mount
note: At this point, first check the size of the
handle thread of your angle grinder. It may be
M6, M8 or M10.
Then place the corresponding mounting bolts
,
, washers
10
11
8
, distance pieces
14
bushings
,
to one side, ready for use.
6
7
Insert the necessary plastic bushings
into the mounting pieces
note: Ensure that the size of the plastic bush-
ings
,
matches the required mounting
6
7
bolts
,
. Plastic bushings are not required
9
10
for mounting bolts M10
Screw the matching mounting bolt
through the rear mounting piece
Fasten the rear mounting piece
tightening the corresponding size of nut
on the mounting bolt
14
turning it in the direction of the mounting piece
(see Fig. B).
Insert the adjustment screw
tom hole and the adjustment screw
on to the base plate
35
on to the mount
with
3
36
and matching nuts
,
12
,
,
and plastic
15
16
17
,
6
7
,
(see Fig. B).
18
38
.
11
,
,
9
10
(see Fig. B).
38
in place by
38
,
12
,
,
(i.e. by
9
10
11
through the bot-
20
through
1
the top hole of the mount
the rubber buffers of these screws must lie
against the angle grinder housing.
note: First insert these screws so that the rubber
buffers lie directly against the mount
Now push the plastic locating pieces
mounting pieces
mount
(Figure B).
36
Then attach the mounting pieces
through the plastic locating pieces
hexagonal socket head screws
gated holes in the mount
Place the desired distance piece
the mounting bolt
32
on to the front mounting piece
note: The three distance pieces
are of different lengths. Choose the distance
piece
,
15
16
note: Set the distance piece
that the cutting disc cannot come into contact
with the workbench / table below the base
plate
(see Figure E).
32
Screw the matching mounting bolt
through the front mounting piece
.
Fasten the front mounting piece
36
tightening the corresponding size of nut
on the mounting bolt
14
turning it in the direction of the mounting piece
,
Now set the adjustment screws
9
,
the angle grinder is aligned at right angles to
13
the base plate
mount
.
36
After slightly loosening the hexagonal socket
head screws
the cutting disc of the angle grinder lowers into
centre of the slot provided in the base plate
Now attach the safety guard
push the safety guard
and fasten it in place with the nut
11
Now insert the metal rod
sponding opening in the mount
,
it in place with the nut
13
bolt
(see Fig. C).
40
)
Always keep the angle grinder's mains lead in
38
place using the clip
After assembly is complete, switch the angle
grinder on for a few seconds and then switch it
. Note that later
36
,
on to the guide of the
18
38
,
18
19
in the elon-
31
(see Fig. A).
36
,
15
,
,
and washer
9
10
11
(see Fig. D).
18
15
,
of the most appropriate length.
17
,
15
16
9
18
in place by
18
,
,
9
10
11
,
1
20
and firmly attached to the
32
, adjust the saddle
35
33
. To do this
5
on to the metal rod
5
(see Fig. C).
4
into the corre-
2
and fasten
36
and the mounting
39
.
37
.
36
of the
19
38
with the
,
on
16
17
8
,
,
16
17
,
so
17
,
,
10
11
.
,
,
12
13
(i.e. by
).
18
so that
so that
.
32
2
GB/IE
15

Publicidad

Tabla de contenido
loading

Tabla de contenido