Free spaces to be observed
For a safe and correct use and an easy
maintenance of the machine, it is advisable to
install it in such a position that observes the
minimum distances, expressed in millimetres,
from the walls or big obstacles shown in the
picture.
Preparation of the machine for its use
Upon receipt of the machine in the User's factory, follow the instructions described below for its correct positioning:
- unpack the machine and remove its protection wrapping.
- lift the machine according to the instructions and warnings described in Chapter "Handling and transport of the machine".
- Install the machine in the desired place.
Preventive checks and controls
Upon receipt of the machine, it is advisable to:
- check if all the parts composing the machine have been delivered to the User's factory,
- check overall condition of the complete device, in particular:
- check that the electric panel board is undamaged;
- check that the main switch is undamaged.
Carefully check if the protective wrapping is visibly torn.
Cleaning and lubrication of the machine
Carefully clean the machine upon receipt in the User.s factory and remove the dust, the foreign and dirtying substances that may have deposited
on the machine during its transportation.
Grease all the mechanical parts exposed to dust, especially in case of sea transport.
Connection to the external power sources
The power cord supplied with the machine is plugged by the Builder. It must be connected to the main supply line after checking that the voltage
and the power supply frequency of the motors and electric components correspond to the voltage and power supply frequency available in the
User's factory.
- Check that the User's power supply voltage corresponds to the one indicated on the machine rating. On the contrary, contact the Builder.
- In compliance with the regulations in force, the User will have to provide the machine with safety devices, to avoid short-circuits and overloads,
in order to protect the machine power supply line.
- Only qualified engineers can connect the machine to the power sources.