(5) Installation of Modular Equipments over Bin or Silos.
Modular makers should be installed over deposits or silos, following the instructions contained in this manual.
The resistance and stability of the container-machine/s assembly should be verified, as well as the fastening elements.
Follow bin manufacturer instructions.
(6) Assembly of the Dispersion Cone (Modular Models)
This device distributes the ice in the bin, and avoids ice compression under the exit pipe. Changing its position, the ice
could be directed to any direction.
(7) Water Level
The function of the water level is to maintain the necessary flow on the evaporator, and using the magnetic micro
device incorporated, stop the operation of the machine until the water reaches again the container.
The optimum level is located on the horizontal indicated in the figure, and its regulation is made following the indications
appearing below.
Probe
Safety Overflow
Float
Turn upwards to increase the level,
and downwards to decrease it. (Grab
from the metalic arm, NEVER FROM
THE FLOAT).
5
USER MANUAL IQ