Descargar Imprimir esta página

KNF LABOPORT SH820G Manual De Instrucciones página 124

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 258
Setup and connection
40
8.1 Preparing for commissioning
Ensure the following points before switching the vacuum sys-
tem on:
Necessary operating requirements
Vacuum
- Connect all hoses correctly
system
(see Chapter Connecting the pump [} 43])
Vacuum
- Data of the voltage supply system are consis-
system
tent with the details on the type plate of the vac-
uum system.
- Vacuum system outlet is not closed or re-
stricted.
- When operating with gas ballast:
When venting the pump through the air inlet, no
explosive or poisonous mixtures can occur.
Vacuum
- Collection flasks correctly mounted (with flask
system
clamps).
(see Chapter Connecting the pump [} 43])
Tab.19: Operating requirements for commissioning
Translation of Originial Operating Instruction, KNF 325562-325564 02/23
Vacuum system SH820G / SR820G / SH840G / SR840G

Publicidad

loading

Este manual también es adecuado para:

Laboport sr820gLaboport sh840gLaboport sr840g