Descargar Imprimir esta página

Bluetti EP600 Manual De Usuario página 59

Ocultar thumbs Ver también para EP600:

Publicidad

Idiomas disponibles

Idiomas disponibles

Precaution of repair and maintenance
The label of Energy Storage System
There are some symbol related safety on the Energy Storage System's label .
Please carefully read and fully understand the content of these labels before
installing the Energy Storage System.
Figure 1-1 Safety label
In the process of operating the Energy Storage System, there exist
high voltage which may cause electric shock, result in the casualty
or serious damage of personal injury and property. Therefore, the
Energy Storage System must be shut down and powered off before
operate any maintenance, and the precaution of safety which listed
in this guidebook and other relevant documents must be strictly
followed when operating the Energy Storage System.
Before operating any maintenance, the electrical connection
between the Energy Storage System and the grid must be
disconnected first, then disconnect the electrical connection
between inverter and PV、battery pack. Wait for at least 30 minutes
until the internal components are discharge completely then the
maintenance can be operated.
In the process of maintenance, please observe the precaution of
anti-static,wear anti-static gloves.
If any maintenance is required, please contact the local authorized
maintenance center. During the maintenance, please try to avoid
irrelevant personnel from entering the maintenance site, tempo-
rary warning signs or fences must be erected for isolation.
Danger
Danger
Attention
57
JUST POWER ON

Publicidad

loading

Productos relacionados para Bluetti EP600