1. For HMG units, an IC-2P accessory connector available as an accessory is required;
2. Before proceeding further, make sure that the SW1 dip-switches are correctly configured:
SW1 (HMG)
DIP 1
DIP 2
ON
ON
4.3 PHASE 2 - SERIAL ADDRESS SETTING OF THE HMI/BHP UNITS
To connect the units to the supervisor, it is necessary to set the correct modbus address to be assigned to the unit; please note that on VMF-E6, VMF-E5 or MULTICONTROL
supervisors, the addresses dedicated to the chillers are: 200, 201, 202, 203. For more information, refer to the documentation of the supervisor to be used.
To set a supervision address on the units, the following steps must be followed:
1. From the main screen, press the key for the HOME screen: