Descargar Imprimir esta página

turbionaire trend Manual De Instrucciones página 9

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 55
3. WALL INSTALLATION
PRELIMINARY OPERATION
Check the wall thickness.
Make sure you have the required tools.
To install, follow the steps below:
ø
110mm
1
5
Bend the grid so that the outer
tabs are horizontal (bend in the
direction indicated by the arrows
printed on the grid).
2
6
Insert the bent grid into the hole,
holding the grid support in one hand
and the safety thread in the other
3
7
Slide the bent grid through the hole
so as to make it completely come
out of the outer wall.
4
8
Bend the grid downwards and it
will open automatically.
9

Publicidad

loading