Descargar Imprimir esta página

Pentair PROSTOP-E 4214N-3404VPSD Manual De Instalación Y Funcionamiento página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION AND OPERATION
Nozzle Body Clamp Torque: 17 inlbs.
Connector Information:
M12 style
IN: A-Code Keying
OUT: D-Code Keying
Termination Cap 2300-0067 required for protection of any unused connector port
DIGITAL/LINBUS OPERATION
The ProStop-E Dual is compatible with Pentair Cannode with firmware revision 1.05 and higher (PN CN32-0001) to allow this
product to integrate into an ISOBUS system.
Each Pentair Cannode can physically support up to 32 ProStop-E Dual nozzle bodies with maintaining individual nozzle control.
Actuating both ProStop-E Dual valves simultaneously will draw considerably more power, so power management (sequential
actuation) or additional Cannodes may be utilized to support the additional power requirements. Multiple Pentair Cannodes can
be used in the same system to support any number of ProStop-E nozzle bodies.
For information on individual Cannode operation, reference L-1586 or contact Hypro Service Center.
4
L-3112 (03-15-22)

Publicidad

loading