Descargar Imprimir esta página

ZEP DYNA-BRUTE Instrucciones De Operacion Y Mantenimiento página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

Wiring Schematic
RECEPTACLE
18/3 SJO
CORD+PLUG
SILVER
GOLD SCREWS
SCREWS
BLACK WIRE, 16AWG
HOT
ROCKER SWITCH
GREEN
SCREW
NEUT
WHITE WIRE, 16 AWG
GRD
GREEN/YELLOW WIRE, 14 AWG
GROUND STUD
Pump Service
Decreased solvent flow from the nozzle could mean not enough solvent is getting to the pump, indicating
a sludge build-up at the pump intake area. Clean pump screen weekly for best operation, more often in
heavy use. Lift pump out of compartment and check bottom of pump compartment for sludge. If it is
necessary to clean the pump compartment remove the sheet metal guard (FIGURE 2(V)) by bending the
edges inward to disengage them from their retaining brackets. The pump has a secondary screen that
may need additional cleaning.
The pump electrical cord is protected by a plastic conduit (FIGURE 2(R)) and passes through a sheet
metal mounting plate to the plug. The entire pump assembly can be easily removed by simply removing
the screw that holds the mounting plate in place.
795-93884
10 of 36
3/4/2022

Publicidad

loading

Este manual también es adecuado para:

Dyna-brute xl