Descargar Imprimir esta página

GreenWorks Pro STB409 Manual Del Operador página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
8.4
ATTACH THE AUXILIARY
HANDLE
1. Remove the knob (16) from the handle.
2. Attach the auxiliary handle and lower clamp (15) on the
shaft.
3. Set the auxiliary handle in the comfortable position.
4. Put the bolt (14) through the holes.
5. Tighten the auxiliary handle with the knob.
7
8.5
INSTALL THE BATTERY PACK
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read and understand the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
1
8.6
REMOVE THE BATTERY PACK
1. Push and hold the battery release button (1).
14
15
16
WARNING
English
2. Remove the battery pack from the machine.
9
OPERATION
Before you operate the machine, read and understand the
safety regulations and the operation instructions.
Be careful when you operate the machine.
9.1
START THE MACHINE
1. Push the lock-out button (3) and pull the trigger (4).
3
2. Push the speed switch (5) to the desired operating speed.
Push the speed switch to position 1 for low speed or
position 2 for high speed.
9.2
STOP THE MACHINE
1. Release the trigger to stop the machine.
9.3
ADJUST THE LENGTH OF THE
CUTTING LINE
While you operate the machine, the cutting line gets worn
shorter. You can adjust the length of the cutting line.
1. While the trimmer is running, bump the trimmer head
against the ground.
8
IMPORTANT
WARNING
5
4

Publicidad

loading