Descargar Imprimir esta página

BSV PRO200V2 Manual De Usuario página 33

Publicidad

Idiomas disponibles

Idiomas disponibles

3- INSTALLATION OF THE EQUIPMENT
3.1- General considerations:
Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter.
If possible, it is recommended to install the cell with a by-pass system with its
corresponding shut-off valves. This is to facilitate maintenance of the cell.
A good earth connection is essential. Use a differential relay with max. 30mA of
sensitivity.
If a good quality earth connection is not available, place an earth connection kit
between the electrolysis cell and the redox probe. OPTIONAL KIT
33 / 53
Manual PRO200V2 V2

Publicidad

loading