Descargar Imprimir esta página

BSV PRO200V2 Manual De Usuario página 35

Publicidad

Idiomas disponibles

Idiomas disponibles

3.2.2- PRO200V2 Electrolysis Cell Diagram
It is highly recommended to install a by-pass system, to be able to block the
water flow in each cell for maintenance purposes.
Connection of the cells to the equipment:
Once the cells are installed, connect the cables, one at each end of the cell,
using the
screws that are included with the equipment.
Make sure the terminals are firmly attached to the cell
35 / 53
Manual PRO200V2 V2

Publicidad

loading