Descargar Imprimir esta página

Basko Healthcare Swing Phase Lock 2 Instrucciones Técnicas página 33

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
The 3 modes to manually control the SPL 2 Joint are:
1. Automatic locking
2. Permanent unlocking
3. Permanent locking
Mode 1
Mode 2
Mode 3
By deactivating the permanent unlocking mode the Satellite switches into the permanent locking
mode and needs to pushed into the Automatic function.
Cleaning / disinfection Instructions
The SPL 2 Joint may not be greased, oiled or in any other way lubricated. When cleaned, please use
Naphtha (no acetone, dilutions or turpentine, etc.) or some similar cleaning fluids or compressed air.
Maintenance Instructions
Maintenance cycles depend strongly on the patients activity level. At a moderate activity level,
the Joints must be checked / serviced every 6 months. When doing this, attention must be paid to
wear and tear, Joint play and damages. If the Joint is no longer running freely, a thorough service is
recommended.
If the Joint has been, due to circumstances, extremely heavily loaded in a flexed position e.g.
with stumbling, tripping or walking (falling) down the staircase, the Joint has to be inspected
by the Orthotist. In case the patient constantly walks with a slightly flexed knee or regularly usage
the safety stops, adjustment of the extension position towards flexion is absolutely necessary.
Used Materials
SPL 2 Joint: Housing: Stainless Steel; Function Unit: brass; Cover plates: ABS plastic
SPC Joint: Housing: Stainless Steel; Cover plates and Bumper Pin: ABS plastic
Satellite:
Housing: ABS, POM plastic; Cable: Teflon
Constructional guidelines
Orthosis construction
Measuring
Casting must be done with a fully, in neutral, extended leg. Stretching however should be possible
without to much effort to allow full extension (needed to unlock the Joint) once the Orthosis is worn.
When the Alignment Unit is used (Art. nr. AK-100/AK-101) to construct the Orthosis, make sure the
square with the T-bar is placed horizontal in the Frontal Plane to keep the axis straight. Alignment
should be based on the plumb line to create a neutral baseline for the Function Unit.
31
Swing Phase Lock 2
Basko
Healthcare

Publicidad

loading