Descargar Imprimir esta página

Glacier bay HD873X-0601 1003421166 Guía De Uso Y Mantenimiento página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Preparing for installation
CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Shut off the water supply to the tub and
shower.
Verify that the hole sizes and positions of the
holes in the wall are correct
The shower and tub spout outlet holes
should be 1-1/4 in. diameter.
Refer to Step 2 for valve access hole
dimensions.
The recommended valve depth to the
nished wall is 2-1/2 in. min. to 3 in. max.
Ensure that the valve body (D) cover is ush
with the nished exterior surface of the wall.
Position the valve body (D) correctly in the
wall with the side marked "UP" pointing up. The
8 in. minimum from the valve body (D) to the tub
spout (J) is required for proper operation.
30 in.
Shower Only
48 in.
Shower Only
1 1/4 in. Diamter
1 1/4 in. Diameter
48 in.
Tub & Shower
Refer to
the step 2
D
8 in. Min.
30 in.
Tub & Shower
2
Installing the valve body and
removing the plaster guard
The plaster guard (L) is positioned so that it is
ush with the nished wall. This ensures that
the valve will be at the correct position to accept
the trim. The depth for the valve body (D) in wall
is measured from the center of the shower
outlet to the nished wall surface. The accepted
depth distance is 2-1/2 in. to 3 in..
Unscrew the screws (K), and remove the plaster
guard (L).
NOTE: Be sure to position the valve body (D) correctly in
the wall, with the side marked "UP" facing upward.
Finished wall
K
7
Please contact 1-855-HD-GLACIER for further assistance.
2-1/2 in. to 3 in.
D
L
L
HOMEDEPOT.COM

Publicidad

loading

Este manual también es adecuado para:

Hd873x-0604 1003421087Hd873x-0627d 1003421411