- T
HE OPERATOR MUST ALWAYS BE INSTALLED INSIDE THE GATE
!
- C
HECK THAT THE OPERATOR VOLTAGE IS THE SAME AS THE MAIN SUPPLY NETWORK
- I
NSTALL ALL THE NECESSARY SAFETY DEVICES TO COMPLY WITH THE REGULATIONS IN FORCE
FOUNDATION BASE ASSEMBLY (B200
Fig. 4
ATTENTION: The screws indicated with the letter
«A» in Fig. 6 are already mounted because they fix
the battery support bracket to the plate. To mount
the operator on the foundation base, it is first
necessary to unscrew them (
SUPPORT AND THE
),
BATTERY PACK
then place the
operator on the
foundation base
and screw again
as indicated in
Fig. 7, including
t h e b a t t e r y
support
PRELIMINARY CHECKS AND DIMENSION FOR INSTALLATION
CHECKS ON THE GATE
Check that:
- The leaf is rigid and compact;
- The lower gate slideway is perfectly
straight, horizontal and without any
obstacles which could obstruct the gate
sliding;
- The lower sliding wheels are equipped
with greasable or watertightened
bearings;
- The upper gate slideway has been
produced and placed so that the gate is
in a perfect vertical position;
OPERATOR ASSEMBLY
(B200
CHAIN VERSION
WITHOUT REMOVE THE
BATTERIES
BATTERIES
SUPPORT
BRACKET
A
Fig. 6
B200 RACK
Fig. 9
(
AND INSIDE THE PROPERTY
CHAIN VERSION
Fig. 5
)
Fig. 7
85 mm
3,35 inches
English
)
(
/
)
230
115
AC
V
AC
V
)
Fig. 8
B200 CHAIN
Fig. 10
3