Descargar Imprimir esta página

NINCOAIR AluG Manual Del Usuario página 7

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
On / Off indicator LED
Up / down
INSTALLATION AND BATTERY CHARGE
Transmitter:
Switch in position OFF
1. Open the battery cover.
2. Fit the batteries (respect polarity).
3. Close battery cover.
BATTERY HELICOPTER CHARGE
Switch in position OFF.
1. Open the charger cable cover.
2. Connect the cable to the helicopter.
3. Turn the switch of the transmitter in (ON) position.
4. Green LED will turn on. When the process finishes the LED will turn
off. (Charging time approx. 30-40 min).
5. Disconnect the plug. The flying time is 5-7 min..
HELICOPTER FLIGHT
1. Select the band in the transmitter A, B o C and the helicopter will automatically identify it.
2. With the helicopter switched off, first switch on the transmitter.
3. Switch on the helicopter.
4. Place the helicopter on the floor.
5. Synchronizing transmitter and helicopter: Full push the left stick for a second.
Switch Charge/Off/On
Tri-band channel
Option A charge
Option B charge
- 5 -
HAND BOOK
Trim
Turn right / left
Forward / backward
ENGLISH

Publicidad

loading