Descargar Imprimir esta página

Arneg ANKARA 3 G3 Manual Del Usuario página 20

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Ankara 3
English
1 - Insert the female screws into the socket box covers (a)
2 - Attach the socket box covers (a) on the rise superstructure (b) using the screws provided
3 - Fix the reactor cover (c) using the screws supplied, as shown in the figure
Lighting wiring:
Insert switch h.
1
2
Connect the wires
to the switch.
3
Insert the socket.
4
Fix the wired socket support cover
onto the rise superstructure.
5
Connect the reactors.
Assemble the light i.
6
7
Connect the light to the socket.
8
Assemble the shelves.
Assemble the shelf central cover f.
9
ATTENZIONE!: Spread the load uniformly. Do not overload the shelves in a disorderly fashion.
The load must NEVER exceed 160 kg/m
N.B.All these operations should be performed by specialised technical personnel.
18.Disposal of the unit
The unit must be disposed of in accordance with your country's waste management legislation and in
respect of our environment.
20
h
g g
2
(Fig. 9)
i
f
05060093 00 15/03/2010

Publicidad

loading

Este manual también es adecuado para:

Ankara 3 g4