7. Installation
Remove the equipment covers as needed to access the input and output connection points. Where cables enter or exit the equipment or
pass through any metal which has magnetic properties, they shall be arranged so all phase and neutral conductors are grouped together
and pass through the same opening in compliance with Article 300.20 of the National Electrical Code (NEC). When pulling cable into the
equipment, take care not to damage any of the internal components and control wiring. Position the cables inside of the equipment so they
are not subject to physical damage and are not forced permanently against the edges of any metal parts. If any cables are in contact with
sharp edges, place suitable protective material between the cable and the metal edge to protect the cable insulation.
Using the appropriate tools, strip a length of insulation from the end of the cable sufficient to fit into the full length of the mechanical lug
for the designated connection point. If using aluminum conductors, apply an appropriate antioxidant compound to the bare aluminum.
Insert the bare conductor into the lug so the bare conductor fills the full length of the mechanical lug body. Tighten the set screw on the
mechanical lug and torque to the values indicated on the Torque Values Label located on the equipment.
Reference the Equipment Schematic Drawing for information on the required connections between the Maintenance Bypass Panel, the UPS
and the critical load.
7.2.4 Pre-Energizing Inspection
Inspection and maintenance should only be performed on equipment that has been de-energized and electrically isolated so that no
accidental contact can be made with energized parts.
The bottom panel of the equipment is the recommended designated area for landing conduit to the equipment. All conduits must be located
to avoid interference with structural members and live bus. A set of drawings for the specific configuration of the equipment is included
inside the equipment. Reference the equipment drawings in Section 10 Reference Materials.
Before energizing the equipment, it must be thoroughly inspected.
1. Remove any foreign materials from inside of the equipment including tools, scraps of wire or other debris.
2. Visually inspect the equipment for any damage that may have occurred during the installation process. Be sure to inspect all insulators,
busbars and other conductors. Do not energize if any damage is found!
3. Verify cable phase orientation at all connection points.
4. Verify all field cable connections are properly torqued.
5. Manually operate all switches to verify proper operation.
6. Verify equipment ground connections are properly terminated.
7. Review the bypass operating sequence prior to actuating the switches.
8. Verify all covers are installed.
7.2.5 Energizing
Hazardous voltages in electrical equipment can cause severe injury or death!
Only qualified persons should attempt to install or service this equipment. A qualified person is one who has skills and knowledge
related to the construction and operation of electrical equipment and installations and has received safety training on the hazards
involved.
Ensure maximum continuous loads do not exceed 80% of the overcurrent protective device (switches and fuses) ratings employed in
other than motor circuits, except for those circuits employing switches marked as suitable for continuous operation at 100% of their
ratings.
Extreme hazards can exist when energizing electrical equipment. Take all precautions necessary to protect people and property when
energizing this equipment. Before energizing the equipment, open/turn off all switches. Refer to the UPS manual for proper startup
procedures.