Descargar Imprimir esta página

AZURO BP-30WS-B Manual De Uso Y Mantenimiento página 8

Bomba térmica para el calentamiento del agua en las piscinas

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
4.3
ELECTRICAL CONNECTION
4.3.1
CONNECTION TO THE MAINS
IMPORTANT: The heat pump is supplied with a power supply cable provided with the plug for connecting it to the
mains socket. Socket installation shall meet the requirements of the ČSN 33 2000 standard, including adequate
protection and installation of a residual-current circuit breaker (RCCB) of the actuating current not exceeding 30 mA.
The use of a double socket with common switching (by a switch or a timer) is recommended.
The heat pump ON/OFF switching is described in chapters 5 and 6.
4.3.2
PERMANENT ELECTRICAL CONNECTION
IMPORTANT: In case you decide to connect your heat pump permanently it will mean an intervention
into its wiring that shall be carried out only by a specialist of appropriate technical qualification and the
installation shall meet the following requirements:
(a) The heat pump together with the power supply for the pump of filtration unit shall be connected via a separate circuit breaker and switch, or, possibly,
a timer for its regular starting. The supply cable shall be of adequate size (the cable of 3x2.5 mm
a residual-current circuit breaker (RCCB) of the actuating current not exceeding 30 mA. The parameters of power network (voltage & frequency) shall
comply with the equipment ones.
(b) The electrical connection shall be carried out by a duly qualified technician in compliance with applicable IEC regulations and standards.
(c) The pump wiring shall be properly grounded. The impedance of grounding circuit shall meet applicable IEC regulations and standards.
(d) The power and control cables shall be wired and laid in the simplest and easy to understand way, without any useless crossing.
(e) Before putting it into operation, the wiring system should be carefully checked and measured with the view to eliminating any erroneous connections.
(f) The following table gives the data of recommended protection.
RCCB parameters
Circuit breaker value
5.0
CONTROL UNIT
5.1
FUNCTIONS OF CONTROL UNIT WITH A LED PANEL
Arrows for parameter setting
and checking
Timer switching ON/OFF
8
Heat pump model
LED display
SET key
BP-30WS-B
Rated current
Operating current
2
cross section is recommended) and provided with
BP-50WS-C
16 A /C
30 mA
16 A /C
Key for heat pump switching
ON/OFF
Time setting
16 A /C
30 mA
16 A /C

Publicidad

loading

Productos relacionados para AZURO BP-30WS-B

Este manual también es adecuado para:

Bp-50ws-c